Daikun
11-21-2009, 07:15 AM
It looks like Adult Swim is up to something in a rather suspicious schedule change (http://www.adultswim.com/schedule/onair.html) on November 17.
1) The days from November 10 to the rest of the month have been replaced with "#####" (that one I find particularly odd).
2) The 1:30/5:30AM slot on December 6 has been replaced with "time shift due to packaging lengths".
3) They've (rather lazily) cut out the final week of the year, which was originally there.
Other than that, I don't see much else being changed. They didn't even bother to chop out the previous two months' schedules, which they should have done by now.
1) The days from November 10 to the rest of the month have been replaced with "#####" (that one I find particularly odd).
2) The 1:30/5:30AM slot on December 6 has been replaced with "time shift due to packaging lengths".
3) They've (rather lazily) cut out the final week of the year, which was originally there.
Other than that, I don't see much else being changed. They didn't even bother to chop out the previous two months' schedules, which they should have done by now.